Bulk Operation

  1. Choose Issues
  2. Choose Operation
  3. Operation Details
  4. Confirmation

Step 1 of 4: Choose Issues

Cancel

T Key Summary Assignee Reporter P Status Resolution Created Updated Due Development
Sub-task ENERGYINTEROP-316

ENERGYINTEROP-325 CLONE -Line 706: OptOut equivalent in IRC model includes: economic, emergency, must run, not participating, outage run status, override status, participating.

William Cox (Inactive) Bruce Bartell (Inactive) Major Closed Fixed  
Sub-task ENERGYINTEROP-302

ENERGYINTEROP-325 Multiple Elements Defined in Service Inventory & Data Model submitted by OSG are not defined in CD01

Bruce Bartell (Inactive) Bruce Bartell (Inactive) Minor Closed Fixed  
Sub-task ENERGYINTEROP-301

ENERGYINTEROP-325 Section 7: Register Services should include register Resource and Asset

Bruce Bartell (Inactive) Bruce Bartell (Inactive) Major Closed Fixed  
Sub-task ENERGYINTEROP-300

ENERGYINTEROP-325 May need to define the enumerated values for the EiEvent Status (line 892)

William Cox (Inactive) Ed Koch (Inactive) Major Closed Fixed  
Sub-task ENERGYINTEROP-298

ENERGYINTEROP-325 Should add a test indicator to the EiEvent model. (line 892)

Ed Koch (Inactive) Ed Koch (Inactive) Major Closed Fixed  
Sub-task ENERGYINTEROP-296

ENERGYINTEROP-325 EiOptout contract name scope

Ed Koch (Inactive) Ed Koch (Inactive) Minor Closed Fixed  
Sub-task ENERGYINTEROP-295

ENERGYINTEROP-325 247: Missing Interactions and Data Elements

Edgardo Luzcando (Inactive) Edgardo Luzcando (Inactive) Critical Closed No Action  
Sub-task ENERGYINTEROP-237

ENERGYINTEROP-325 Incorporate use of emix price models into EiEvent (WD16 - 642, 709)

Ed Koch (Inactive) Ed Koch (Inactive) Major Closed Fixed  
Sub-task ENERGYINTEROP-232

ENERGYINTEROP-325 Need more detailed specification of the interaction models, specifically around the acknowldgement of the reception of DR signals (WD16 - e.g. 642))

Ed Koch (Inactive) Ed Koch (Inactive) Minor Closed Fixed  
Sub-task ENERGYINTEROP-216

ENERGYINTEROP-325 Critical: Provide a mechanism for load bidding information in EiEvent (WD15, 643-649)

William Cox (Inactive) Girish Ghatikar (Inactive) Major Closed Fixed  
Sub-task ENERGYINTEROP-215

ENERGYINTEROP-325 Remove 0-* as optional requirements/services/elements as it creates interoperability challenges (WD15, ln 643-649)

Toby Considine Girish Ghatikar (Inactive) Major Closed Fixed  
Sub-task ENERGYINTEROP-214

ENERGYINTEROP-325 Add a mechanism for VEN to send status information to VTNs - a with request from VTN (WD15, section 5):

Girish Ghatikar (Inactive) Girish Ghatikar (Inactive) Major Closed Fixed  
Sub-task ENERGYINTEROP-205

ENERGYINTEROP-325 Line 721: testEvent should be expanded from Boolean to allow for indication of other types of Events: Advanced (Normal), Immediate, Audit/Test.

William Cox (Inactive) Bruce Bartell (Inactive) Major Closed Fixed  
Sub-task ENERGYINTEROP-201

ENERGYINTEROP-325 Line 706: OptOut equivalent in IRC model includes: economic, emergency, must run, not participating, outage run status, override status, participating.

Toby Considine Bruce Bartell (Inactive) Major Closed Fixed  
Sub-task ENERGYINTEROP-195

ENERGYINTEROP-325 Lines 598, 604 where is the interaction for DR Standing Bid defined?

Girish Ghatikar (Inactive) Bruce Bartell (Inactive) Major Closed Fixed  

Cancel