Line 295 - StartingDateTime is marked as "Optional" but if it is required when scheduling a sequence and sequence is a mandatory field, this element could not be optional.

    • Type: Improvement
    • Resolution: Fixed
    • Priority: Major
    • wd17
    • Affects Version/s: csprd01 Public Review Draft
    • Component/s: spec
    • None
    • Environment:

      IRC

    • Hide

      A product need not be scheduled until performance is called. It is possible to have a contract with no start date (see DR) and certainly possible to have resources offered to the market without an start date.

      See Energy Interoperation for specific Energy Transactions, and their specific conformance requirements.

      Show
      A product need not be scheduled until performance is called. It is possible to have a contract with no start date (see DR) and certainly possible to have resources offered to the market without an start date. See Energy Interoperation for specific Energy Transactions, and their specific conformance requirements.
    • Hide

      A product need not be scheduled until performance is called. It is possible to have a contract with no start date (see DR) and certainly possible to have resources offered to the market without an start date.

      See Energy Interoperation for specific Energy Transactions, and their specific conformance requirements.

      Show
      A product need not be scheduled until performance is called. It is possible to have a contract with no start date (see DR) and certainly possible to have resources offered to the market without an start date. See Energy Interoperation for specific Energy Transactions, and their specific conformance requirements.