Would like to see the tables Section 1.8 in wd17 (lines 129 through 165) moved to an appendix and the remaining text integrated into the main body of the spec. The WS-Calendar spec has already been listed as normative. We don't include this level of detail from other specs that are normative in the body of our spec.
Do we need 4 calendaring specs as normative references to effect time management for energy transactions?
Typo on line 133: 'specifies' s/b 'specified'.