• Type: Improvement
    • Resolution: Fixed
    • Priority: Major
    • wd29
    • Affects Version/s: wd28
    • Component/s: spec
    • None
    • Environment:

      Anne Hendry

    • Hide

      Proposal:

      • create a Schedule object in EMIX with clear definition, or
      • create Glossary entry instead and don't use it in element names or
      • decide it is a BusinessSchedule and use that term consistently throughout instead of Schedule or
      • decide BusinessSchedule is not needed and just use Schedule
      • merge information described in the current references into one place – easily read/understood, not redundant
      • update names of elements that currently use 'Schedule' accordingly
      Show
      Proposal: create a Schedule object in EMIX with clear definition, or create Glossary entry instead and don't use it in element names or decide it is a BusinessSchedule and use that term consistently throughout instead of Schedule or decide BusinessSchedule is not needed and just use Schedule merge information described in the current references into one place – easily read/understood, not redundant update names of elements that currently use 'Schedule' accordingly
    • Hide

      Business Schedule eliminated and vavailability used throught the specification and schemas

      Schedule defined up front as "A Sequence populated with a Product Description"

      Show
      Business Schedule eliminated and vavailability used throught the specification and schemas Schedule defined up front as "A Sequence populated with a Product Description"

      The term 'schedule' appears frequently throughout the EMIX spec, in the prose, in definitions, and as a component of 5 EMIX element names. There doesn't seem to be a definition (or single complete description) of 'schedule'. Did not see definition in ws-calendar.

      In emix.xsd there is an EMIX (namespace) 'BusinessScheduleType' (see schema fragment below, and highlighted in green in the uploaded spec). However there is no 'BusinessScheduleType' defined in the spec. There are 3 mentions of a 'business schedule' in the spec text, starting in Section 6, one capitalized, two not, but is not defined.

            Assignee:
            William Cox (Inactive)
            Reporter:
            Anne Hendry (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            0 Start watching this issue

              Created:
              Updated:
              Resolved: