Details

    • Type: Sub-task
    • Status: Closed
    • Priority: Major
    • Resolution: Fixed
    • Affects Version/s: CSD03/PR03
    • Fix Version/s: wd36
    • Component/s: None
    • Labels:
      None
    • Environment:

      Aaron Snyder

    • Proposal:
      Hide

      Provide illumination or modification to address potential issue.

      Show
      Provide illumination or modification to address potential issue.
    • Resolution:
      Hide

      Close no action as this is in the specification.

      The requirement stated is "...develop and support a summary...". That need is met by Section 16. The fact that it is optional is not relevant to the requirement.

      Show
      Close no action as this is in the specification. The requirement stated is "...develop and support a summary...". That need is met by Section 16. The fact that it is optional is not relevant to the requirement.

      Description

      The price model shall develop and support a summary of power reliability and quality characteristics that affect price and desirability (demand side).

      Validation:
      Summary of power quality is in Section 16. Note that the PQ summary structure is an optional attachment to an interval or gluon in an emix:product description that is a component of a qualityWarrant. There does not appear to be a constraint that ensures that a qualityWarrant has a qualtityMeasure component. Could use an example of how this can be described.

      Related to:
      emix:product description, qualityWarrant, qualtityMeasure

        Attachments

          Activity

            People

            • Assignee:
              toby.considine Toby Considine (Inactive)
              Reporter:
              afsnyder Aaron Snyder (Inactive)
            • Watchers:
              0 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: