-
Type:
Sub-task
-
Resolution: Fixed
-
Priority:
Major
-
Affects Version/s: CSD04/PR04
-
Component/s: errata
-
None
-
Environment:
PR04 Comment Allen Jones
The following comment relates to the difference tracked version of the EMIX draft standard (http://docs.oasis-open.org/emix/emix/v1.0/csprd04/emix-v1.0-csprd04-diff.pdf).
In the previous version of the standard, lines 867 - 870 read "An example is the sale of 1 MW tomorrow between 3 and 5 PM that may be measured every 15 minutes (The energy is 1 MWh). The power in each 15 minute Interval is 1 MW and the Energy in each 15 minute Interval is 0.25 MWh."
In the latest version of the standard, lines 867 - 870 were changed to "An example is the sale of 1 MW tomorrow between 3 and 5 PM that may be measured every 15 minutes (The energy is 1 MWh). The power in each 15 minute Interval is 2 MW and the Energy in each 15 minute Interval is 0.25 MWh."
I believe that the wrong "1" was changed and that the sentences should actually read "An example is the sale of 1 MW tomorrow between 3 and 5 PM that may be measured every 15 minutes (The energy is 2 MWh). The power in each 15 minute Interval is 1 MW and the Energy in each 15 minute Interval is 0.25 MWh."
Thank you,
Allen Jones