• Type: Sub-task
    • Resolution: Fixed
    • Priority: Major
    • errata for CS01
    • Affects Version/s: CSD04/PR04
    • Component/s: errata
    • None
    • Environment:

      PR04 Comment Allen Jones

    • Hide

      Correct in errata to 1.0

      Show
      Correct in errata to 1.0

      The following comment relates to the difference tracked version of the EMIX draft standard (http://docs.oasis-open.org/emix/emix/v1.0/csprd04/emix-v1.0-csprd04-diff.pdf).

      In the previous version of the standard, lines 867 - 870 read "An example is the sale of 1 MW tomorrow between 3 and 5 PM that may be measured every 15 minutes (The energy is 1 MWh). The power in each 15 minute Interval is 1 MW and the Energy in each 15 minute Interval is 0.25 MWh."

      In the latest version of the standard, lines 867 - 870 were changed to "An example is the sale of 1 MW tomorrow between 3 and 5 PM that may be measured every 15 minutes (The energy is 1 MWh). The power in each 15 minute Interval is 2 MW and the Energy in each 15 minute Interval is 0.25 MWh."

      I believe that the wrong "1" was changed and that the sentences should actually read "An example is the sale of 1 MW tomorrow between 3 and 5 PM that may be measured every 15 minutes (The energy is 2 MWh). The power in each 15 minute Interval is 1 MW and the Energy in each 15 minute Interval is 0.25 MWh."

      Thank you,
      Allen Jones

            Assignee:
            Toby Considine (Inactive)
            Reporter:
            William Cox (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            0 Start watching this issue

              Created:
              Updated:
              Resolved: