Cardinality of power:powerItem and power:energyItem in Offer Curves

    • Type: Improvement
    • Resolution: Unresolved
    • Priority: Minor
    • None
    • Affects Version/s: CS02
    • Component/s: schema
    • None
    • Environment:

      Steve Ray

      Section 13.6.2 Offer Curves (line 1056):

      Please consider the cardinality of power:powerItem and power:energyItem. Should both be mandatory? Conformance should require at least one if they are optional. Should optionality be included in the specification?

            Assignee:
            William Cox (Inactive)
            Reporter:
            Toby Considine (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated: