Uploaded image for project: 'OASIS Energy Interoperation TC'
  1. OASIS Energy Interoperation TC
  2. ENERGYINTEROP-115

Lines 220-222: Is there an assumption that the communications between the Generator and Consumer is direct?

    XMLWordPrintable

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Minor
    • Resolution: Fixed
    • Affects Version/s: wd13
    • Fix Version/s: wd16
    • Component/s: spec
    • Labels:
      None
    • Resolution:
      Hide

      Line-by-line review of Current draft completed between Toby Considien and Edgardo

      Show
      Line-by-line review of Current draft completed between Toby Considien and Edgardo

      Attachments

        Activity

          People

          • Assignee:
            william.cox William Cox (Inactive)
            Reporter:
            edgardo.luzcando Edgardo Luzcando (Inactive)
          • Watchers:
            0 Start watching this issue

            Dates

            • Created:
              Updated:
              Resolved: