Lines 328-381 - Section 2.1 Scope of Energy Interoperation

    • Type: Bug
    • Resolution: Fixed
    • Priority: Major
    • wd16
    • Affects Version/s: wd13
    • Component/s: spec
    • None
    • Hide

      Line-by-line review of Current draft completed between Toby Considien and Edgardo

      Show
      Line-by-line review of Current draft completed between Toby Considien and Edgardo

      In EITC discussions there was a topic regarding whether the IRC Measurement and Performance Interactions (4.x series) were in scope and whether they would (or should) be covered by PAP 10. Line 330 says that EI "includes measurement and verification of curtailment" so it is unclear why would it be out of scope.

            Assignee:
            William Cox (Inactive)
            Reporter:
            Edgardo Luzcando (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            0 Start watching this issue

              Created:
              Updated:
              Resolved: