In EITC discussions there was a topic regarding whether the IRC Measurement and Performance Interactions (4.x series) were in scope and whether they would (or should) be covered by PAP 10. Line 330 says that EI "includes measurement and verification of curtailment" so it is unclear why would it be out of scope.
Lines 328-381 - Section 2.1 Scope of Energy Interoperation
- Assignee:
-
William Cox (Inactive)
- Reporter:
-
Edgardo Luzcando (Inactive)
- Votes:
-
0 Vote for this issue - Watchers:
-
0 Start watching this issue
- Created:
- Updated:
- Resolved: