Uploaded image for project: 'OASIS Energy Interoperation TC'
  1. OASIS Energy Interoperation TC
  2. ENERGYINTEROP-118

Lines 328-381 - Section 2.1 Scope of Energy Interoperation

    XMLWordPrintable

    Details

    • Type: Bug
    • Status: Closed
    • Priority: Major
    • Resolution: Fixed
    • Affects Version/s: wd13
    • Fix Version/s: wd16
    • Component/s: spec
    • Labels:
      None
    • Resolution:
      Hide

      Line-by-line review of Current draft completed between Toby Considien and Edgardo

      Show
      Line-by-line review of Current draft completed between Toby Considien and Edgardo

      Description

      In EITC discussions there was a topic regarding whether the IRC Measurement and Performance Interactions (4.x series) were in scope and whether they would (or should) be covered by PAP 10. Line 330 says that EI "includes measurement and verification of curtailment" so it is unclear why would it be out of scope.

        Attachments

          Activity

            People

            • Assignee:
              william.cox William Cox (Inactive)
              Reporter:
              edgardo.luzcando Edgardo Luzcando (Inactive)
            • Watchers:
              0 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: