Uploaded image for project: 'OASIS Energy Interoperation TC'
  1. OASIS Energy Interoperation TC
  2. ENERGYINTEROP-147

217 - Should be a dotted from generator to the consumer.

    XMLWordPrintable

    Details

    • Type: Improvement
    • Status: Closed
    • Priority: Major
    • Resolution: Won't Fix
    • Affects Version/s: wd14
    • Fix Version/s: wd16
    • Component/s: schema
    • Labels:
      None
    • Environment:

      SGIP-PAP09 Albert Chiu

    • Resolution:
      Hide

      Diagram is a general diagram not describing any particular business model or extant market

      Show
      Diagram is a general diagram not describing any particular business model or extant market

      Description

      Comment made on previous draft. DH figures are not updated. TC if generator is in the building should it still have a dotted line? AC Good point. Looking at graphic, because of the domains – first thing was domains. DH figure implies domains. R: rather than making a gen - make a local generation, clarifies a lot of confusion.

        Attachments

          Activity

            People

            • Assignee:
              toby.considine Toby Considine (Inactive)
              Reporter:
              toby.considine Toby Considine (Inactive)
            • Watchers:
              0 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: