Uploaded image for project: 'OASIS Energy Interoperation TC'
  1. OASIS Energy Interoperation TC
  2. ENERGYINTEROP-191

General - One thing is a model : DR is done by having a building integrator spend 2 weeks.

    XMLWordPrintable

    Details

    • Type: Improvement
    • Status: Closed
    • Priority: Major
    • Resolution: Fixed
    • Affects Version/s: wd14
    • Fix Version/s: wd17
    • Component/s: spec
    • Labels:
      None
    • Environment:

      SGIP-PAP09 Toby Considine

    • Resolution:
      Hide

      Re-written

      Show
      Re-written

      Description

      Model should be : if possible no building integrator should be called, just figure it out, so low barrier to entry. Too much creativity on this one point may create a barrier to entry.

        Attachments

          Activity

            People

            • Assignee:
              toby.considine Toby Considine (Inactive)
              Reporter:
              toby.considine Toby Considine (Inactive)
            • Watchers:
              0 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: