Uploaded image for project: 'OASIS Energy Interoperation TC'
  1. OASIS Energy Interoperation TC
  2. ENERGYINTEROP-234 Figures 7, 8 need to lose the ERM and acquire a VTN...Verify service names in Figure 8
  3. ENERGYINTEROP-233

Figure 6 is a repeat of of figure 1. This is OK, the narrative reprise works with the text. Figure 6 should probably be decorated with the VTN/VEN labels to show development, and not an error.

    XMLWordPrintable

    Details

    • Type: Sub-task
    • Status: Closed
    • Priority: Major
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: wd17
    • Component/s: None
    • Labels:
      None
    • Resolution:
      Hide

      Redrew figures.

      Show
      Redrew figures.

      Description

      Figure 6 is a repeat of of figure 1. This is OK, the narrative reprise works with the text. Figure 6 should probably be decorated with the VTN/VEN labels to show development, and not an error.

        Attachments

          Activity

            People

            • Assignee:
              william.cox William Cox (Inactive)
              Reporter:
              toby.considine Toby Considine (Inactive)
            • Watchers:
              0 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: