Uploaded image for project: 'OASIS Energy Interoperation TC'
  1. OASIS Energy Interoperation TC
  2. ENERGYINTEROP-322 Plenty of Examples Collector
  3. ENERGYINTEROP-314

Two Part Retail Pricing - Peak-time Rebate (or Critical Peak Rebate)

    XMLWordPrintable

    Details

    • Type: Sub-task
    • Status: Deferred
    • Priority: Major
    • Resolution: Unresolved
    • Affects Version/s: csd01 - Public Review Draft
    • Fix Version/s: 1.1
    • Component/s: note
    • Labels:
      None
    • Environment:

      Centolella

    • Proposal:
      Hide

      This belongs in the Note on Energy Interoperation, post PR02, with the other examples. Add component and transfer to that new component in the project.

      Show
      This belongs in the Note on Energy Interoperation, post PR02, with the other examples. Add component and transfer to that new component in the project.
    • Resolution:
      Hide

      Post PR02 - This belongs in the Note on Energy Interoperation, post PR02, with the other examples. Add component and transfer to that new component in the project.

      Show
      Post PR02 - This belongs in the Note on Energy Interoperation, post PR02, with the other examples. Add component and transfer to that new component in the project.

      Description

      Under this approach, consumers receive a bill credit or rebate to the extent they reduce their usage below individual baseline levels during certain peak pricing events (Attachment J). The baselines of individual consumers are administratively determined, often based on usage in a recent past time period. Of note, baselines are based on an administratively determined formula set out in the utility's tariff or operating procedures. Under such a design, there is the potential to create significant variation in how baseline usage values are determined. Different utility rate designs could calculate baseline usage based upon differing time periods, selected by day type, date proximity, demand levels, weather conditions, or other factors. Additional adjustments could be made to the baseline to address conditions deemed unrepresentative or other concerns.

      For supporting detail, see:
      http://www.oasis-open.org/committees/download.php/40642/Centolella-%20Comments%20on%20EMIX%20Product%20Specification%20Standard%20complete%20FINAL.zip

        Attachments

          Activity

            People

            • Assignee:
              ecazalet Edward Cazalet (Inactive)
              Reporter:
              toby.considine Toby Considine (Inactive)
            • Watchers:
              0 Start watching this issue

              Dates

              • Created:
                Updated: