Uploaded image for project: 'OASIS Energy Interoperation TC'
  1. OASIS Energy Interoperation TC
  2. ENERGYINTEROP-351

In EiConstraint the assocation for notificationInterval and maxEventDuration should be duration, not Sequence; the schedule should be emix::BusinessSchedule

    XMLWordPrintable

    Details

    • Type: Improvement
    • Status: Closed
    • Priority: Major
    • Resolution: Fixed
    • Affects Version/s: wd22
    • Fix Version/s: wd23
    • Component/s: None
    • Labels:
      None
    • Environment:

      William Cox

    • Resolution:
      Hide

      Change EiConstraint::notificationInterval and maxEventDuration to type duration.

      Change all schedules in Figures 11-1 and 11-3 to emix::BusinessScheduleType

      It's all Terms, and shoulfd come from emix:standardTerms

      Show
      Change EiConstraint::notificationInterval and maxEventDuration to type duration. Change all schedules in Figures 11-1 and 11-3 to emix::BusinessScheduleType It's all Terms, and shoulfd come from emix:standardTerms

      Description

      EiConstraint has two associations to WS-Calendar::Sequence which no longer exists.

      The appropriate reference would be to the type duration (XSDsimpleType) and rather than an association these should be attributes in EiConstraint.

      For the EiConstraintSchedule the actual schedule should be emix::BusinessScheduleType which is consistent with the EMIX wd19b schemas (thought the type is now EMIX::BusinessScheduleType).

        Attachments

          Activity

            People

            • Assignee:
              william.cox William Cox (Inactive)
              Reporter:
              william.cox William Cox (Inactive)
            • Watchers:
              0 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: