Details

    • Type: Sub-task
    • Status: Closed
    • Priority: Major
    • Resolution: Fixed
    • Affects Version/s: wd24
    • Fix Version/s: wd32
    • Component/s: service
    • Labels:
      None
    • Environment:

      Girish Ghatikar

    • Proposal:
      Hide

      To be discussed with the TC.

      Post 1.0. This is a significant proposed extension to functionality.

      1. wd24 EiFeedback services provides means for periodically or one-time measure of demand and energy use. This is historical for the period designated in the EiCreateFeedback service operation.

      2. Feedback is response, not prediction. Others (e.g. ASHRAE SPC201P) are workiing on projected use and demand.

      3. Projected demand, curtailment, generation availability is post-1.0; collaboration with the ASHRAE technical committee and soliciting comments from their members seems a good way forward.

      4. EiDelivery addresses this in part.

      Show
      To be discussed with the TC. Post 1.0. This is a significant proposed extension to functionality. 1. wd24 EiFeedback services provides means for periodically or one-time measure of demand and energy use. This is historical for the period designated in the EiCreateFeedback service operation. 2. Feedback is response, not prediction. Others (e.g. ASHRAE SPC201P) are workiing on projected use and demand. 3. Projected demand, curtailment, generation availability is post-1.0; collaboration with the ASHRAE technical committee and soliciting comments from their members seems a good way forward. 4. EiDelivery addresses this in part.
    • Resolution:
      Hide

      Historical functions are meet (and satisfy the feedback requirements) as part of the EiReport Service (EiReport, allow periodic send and historical responses, EiHistorian to "start recording" at some time in the past.)

      Projected demand, curtailment, generation availability is available through the Projection operations in EiReport, requesting projections with confidence. This is the model accepted by ASHRAE SPC201P as of mid-2011. They are building an information model; these operations allow access to the information.

      EiDelivery addresses delivery at an emixInterface.

      Define the full EiReport Service including Historian, Report, and Projection operations, in wd32.

      Show
      Historical functions are meet (and satisfy the feedback requirements) as part of the EiReport Service (EiReport, allow periodic send and historical responses, EiHistorian to "start recording" at some time in the past.) Projected demand, curtailment, generation availability is available through the Projection operations in EiReport, requesting projections with confidence. This is the model accepted by ASHRAE SPC201P as of mid-2011. They are building an information model; these operations allow access to the information. EiDelivery addresses delivery at an emixInterface. Define the full EiReport Service including Historian, Report, and Projection operations, in wd32.

      Description

      Feedback Service:

      The feedback service is intended to meet the Smart Grid's need from resources (think VEN) to address the DR program requirements across different markets (think VTN). The following are some of the services to get started. These can potentially vary depending on the DR signal traversal from VEN to the final designated VTN. It is not intended to be be exclusive requirement under one service of EI and can be supported by different standards/PAP activities such as PAP 10/OpenADE, PAP 17/ASHRAE, etc.:

      1. Measured demand.
      a. Current (for load shed verification/settlement)
      b. Historical (for baseline, forecast, etc.)
      c. Optionally, can include peak values (although it can be extrapolated from above).

      2. Predicted demand (this parameter can be a calculated data point or estimated by a VEN to VTN)

      3. DR Availability (also includes any DER availability for DR)
      a. How much is available in next hour?
      b. How much is available in next 24-hours?
      c. Optionally, how much is available next week?

      4. Resource location identifier
      a. Meter (s),
      b. Locational information (e.g., address, grid location indicator, sub-station, etc.)
      c. Optionally, assets.

      6. Schedule information to above as appropriate.

        Attachments

          Activity

            People

            • Assignee:
              gghatikar Girish Ghatikar (Inactive)
              Reporter:
              gghatikar Girish Ghatikar (Inactive)
            • Watchers:
              0 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: