Details

    • Type: Sub-task
    • Status: Closed
    • Priority: Minor
    • Resolution: Fixed
    • Affects Version/s: wd24
    • Fix Version/s: wd25
    • Component/s: None
    • Labels:
      None
    • Environment:

      Gerald Gray

    • Proposal:
      Hide

      Change as noted above.

      Show
      Change as noted above.
    • Resolution:
      Hide

      Slightly modified from Description. Apply all but those otherwise marked in ALL CAPS.

      Line 286 change "market" to "markets"

      line 305 remove comma at end of line

      line 320 - 321 change to read: However, interaction patterns in this specification are defined to provide additional information for markets in which tariffs or market rules are required.

      Line 323 Change from "We consider Smart Energy to be the transactions ..." to "Smart Energy, in this specification, refers to the ..."

      Line 327 change to: In this specification the information exchanged and the services needed to implement smart energy are defined.

      Line 326 and 329 are extra blank lines - delete.

      Line 364 - 365 change to: Communication of price in transactions is at the core of the Energy Interoperation services. Four types of prices are identified in this specification:

      CONSIDER THIS CHANGE IN LIGHT OF OTHERS FOR THIS SECTION:
      Line 388 change to: The prices may be fixed by contracts or tariffs that change infrequently if at all.

      OTHER RESOLVED ISSUES ADDRESS THIS SENTENCE AND INCLUDE THIS CHANGE, SO DON'T APPLY 423-424
      Line 423 -424 change to: Transactive energy refers to market-based energy transactions. Today it is used for wholesale energy interoperations; buying and selling of energy and trading options.
      (remove the (and what else), when we get a "what else" we can add it. (thinking in terms of preparing this spec for the next PR)

      Line 711 change to: This terminology is used through all service definitions presented in this specification.

      Line 732 change to: The services presented in this specification are divided into four broad categories:

      Line 788 - 789 change to: To construct an operation name for the EiEvent service, "Ei" is concatenated tp name fragment (verb) as listed. For example, an operation to cancel an outstanding operation or event is called EiCancelEvent

      Line 795 change to: In this section, without loss of generality, it is assumed that the invoker is the VTN and the responder is the VEN, except for where the PULL pattern is used wherein the roles would be reversed.

      Show
      Slightly modified from Description. Apply all but those otherwise marked in ALL CAPS. Line 286 change "market" to "markets" line 305 remove comma at end of line line 320 - 321 change to read: However, interaction patterns in this specification are defined to provide additional information for markets in which tariffs or market rules are required. Line 323 Change from "We consider Smart Energy to be the transactions ..." to "Smart Energy, in this specification, refers to the ..." Line 327 change to: In this specification the information exchanged and the services needed to implement smart energy are defined. Line 326 and 329 are extra blank lines - delete. Line 364 - 365 change to: Communication of price in transactions is at the core of the Energy Interoperation services. Four types of prices are identified in this specification: CONSIDER THIS CHANGE IN LIGHT OF OTHERS FOR THIS SECTION: Line 388 change to: The prices may be fixed by contracts or tariffs that change infrequently if at all. OTHER RESOLVED ISSUES ADDRESS THIS SENTENCE AND INCLUDE THIS CHANGE, SO DON'T APPLY 423-424 Line 423 -424 change to: Transactive energy refers to market-based energy transactions. Today it is used for wholesale energy interoperations; buying and selling of energy and trading options. (remove the (and what else), when we get a "what else" we can add it. (thinking in terms of preparing this spec for the next PR) Line 711 change to: This terminology is used through all service definitions presented in this specification. Line 732 change to: The services presented in this specification are divided into four broad categories: Line 788 - 789 change to: To construct an operation name for the EiEvent service, "Ei" is concatenated tp name fragment (verb) as listed. For example, an operation to cancel an outstanding operation or event is called EiCancelEvent Line 795 change to: In this section, without loss of generality, it is assumed that the invoker is the VTN and the responder is the VEN, except for where the PULL pattern is used wherein the roles would be reversed.

      Description

      Line 286 change "market" to "markets"
      line 305 remove comma at end of line
      line 320 - 321change to read: However, interactions patterns were developed to provide additional information for markets in which they are required.

      Line 323 Change from "We consider Smart Energy to be the transactions ..." to "Smart Energy, in the context of this specification, refers to the ..."

      Line 327 change to: In this specification the information exchanged and the services needed to implement smart energy are defined.

      Line 364 - 365 change to: Communication of price in transactions is at the core of the Energy Interoperation services and four types of prices are identified in this specification:

      Line 388 change to: The prices may be fixed tariffs that change infrequently if at all.

      Line 423 -424 change to: Transactive energy refers to market-based energy transactions. Today it is used for wholesale energy interoperations; buying and selling of energy and trading options.
      (remove the (and what else), when we get a "what else" we can add it. (thinking in terms of preparing this spec for the next PR)

      Line 711 change to: This terminology is used through all service definitions presented in this standard.

      Line 732 change to: The services presented in this specification are divided into four broad categories:

      Line 788 - 789 change to: To construct an operation name for the EiEvent service, "Ei" is concatenated tp name fragment (verb) as listed. For example, an operation to cancel an outstanding operation or event is called EiCancelEvent

      Line 795 change to: In this section, without loss of generality, it is assumed that the invoker is the VTN and the responder is the VEN, except for where the PULL pattern is used wherein the roles would be reversed.

        Attachments

          Activity

            People

            • Assignee:
              toby.considine Toby Considine (Inactive)
              Reporter:
              gerald.gray Gerald Gray (Inactive)
            • Watchers:
              0 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: